Portföy - Kayseri 4.25 MW GES Power Plant

Kayseri 4.25 MW GES Power Plant


  • 10/09/2021
Project Description

Our SPP project, located in Kayseri province, became operational in 2017. It has an installed power of 4.25 MW in İncesu locality. The annual average production amount is 6.865 MWh.

 

Capacity: 4.25 MWe

Average generation: 6.865 MWh

Commissioning date: 2017

Prevented carbon emissions: 6.473 tons/year