Our SPP project, located in Elazig province, became operational in 2019. It has an installed power of 1.18 MW in Golardi locality. The annual average production amount is 2.100 MWh.
Capacity: 1.18 MWe
Average generation: 2.100 MWh
Commissioning date: 2019
Prevented carbon emissions: 1.100 tons/year